Poster: A snowHead
|
Having managed to get rid of the Venture Capital idiots there is a investment plan for next year. I thought the plan was to update Emerald to a 6 and use the old chair over the back of the Whistler Peak as had been suggested, but instead they are opening up the great skiing in Crystal more and putting more capacity in to Harmony instead. See below. or here for pictures http://www.whistlerblackcomb.com/the-mountain/new-lifts/index.aspx?crmcontact=5317016&crmnws=ROG_WB_NWS_01_E1_130118
WHISTLER BLACKCOMB ANNOUNCES MAJOR $18 MILLION CAPITAL EXPANSION FOR 2013.2014
Lift Expansion Includes New Whistler Mountain Harmony High-Speed Six-Pack Chairlift And New High-Speed Quad Chairlift In Blackcomb Mountain’s Crystal Zone
WHISTLER, BC, January 18, 2013 – Whistler Blackcomb has unveiled capital plans for a major lift expansion. Whistler Mountain’s Harmony high-speed, quad chairlift will be replaced with a new Doppelmayr high-speed, detachable, six-pack chairlift capable of transporting six people on each chair. Blackcomb Mountain will see a lift enhancement with a high-speed quad chairlift going into a new area in the Crystal Zone, currently accessed by a fixed-grip triple chair.
“This lift expansion clearly demonstrates our commitment to continuously enhance the skiing and riding experience on both mountains,” says Dave Brownlie, President and Chief Executive Officer, Whistler Blackcomb. “Each zone the new lifts will service is unique and much-loved by Whistler locals and destination guests alike. The capital we are investing to enhance our already amazing experiences will make Whistler Blackcomb even better.”
The new high-speed quad chairlift in the Crystal Zone will be 1,708 metres (5,604ft) in length, with a vertical rise of 535 metres (1,755ft). Skier carrying capacity will increase by 65 per cent over the current lift to 2,400 skiers per hour. The new quad will deliver skiers and riders to the same location as the current triple chair next to the Crystal Hut. However, the aspect of the new lift line is dramatically different, and will originate 158 metres (518ft) lower than the old Crystal lift. The bottom elevation will be 1,292 metres (4,239ft) and the top elevation of the lift will be 1,827 metres (5,994ft).
This bottom terminal location along the Blackcomb Glacier Road ski-out eliminates the need to utilize the Excelerator Chair to access many Crystal Zone trails including Ridge Runner, Rock ‘N’ Roll, and gladed trails like Outer Limits. It will be even quicker to return to the Glacier Express chair to access Horstman Glacier, Blackcomb Glacier and Spanky’s. The increased length of the chair’s line will give skiers and riders the opportunity to lap the entire Crystal Zone – from undulating cruisers to gladed zones riddled with natural terrain features and snow-caked trees straight out of a Dr. Seuss book. The name of this exciting new quad chairlift will be determined through a competition to be announced by Whistler Blackcomb later this winter.
The Harmony Six high-speed chairlift will replace one of Whistler Blackcomb’s most popular lifts and will dramatically improve the uphill capacity by 50 per cent; going from 2,400 skiers per hour to 3,600. The Harmony Six will service terrain spanning from the edge of the Symphony Amphitheatre all the way over to Glacier Bowl, adjacent to the Peak Express. This area, known as the Harmony Zone, makes up over 485 hectares (1,200 acres) of Whistler Blackcomb’s 3,306 hectares (8,171 acres) of total terrain. With a wide variety of beginner to expert terrain options, the Harmony Six will ensure skiers and riders are able to spend more time on the mountain exploring the spectacular, powder-covered alpine that Whistler Blackcomb is celebrated for.
The Harmony Six has the same alignment as the current Harmony quad; spanning 1,729 metres (5,672ft) in length, with a vertical rise of 525 metres (1,722ft). The top elevation of the lift is 2,107 metres (6,912ft); the bottom elevation is 1,582 metres (5,190ft).
Construction on the lifts will begin this spring and will continue through the summer and fall with an expected opening at the beginning of the 2013.2014 winter season.
Edit to put URL in
Last edited by Poster: A snowHead on Sat 19-01-13 10:47; edited 1 time in total
|
|
|
|
|
Obviously A snowHead isn't a real person
Obviously A snowHead isn't a real person
|
Well it's about time they updated Crystal - It was on it's last legs when I worked there in '98-'99. I guess Harmony is just going to get skied out faster than ever. When I skied there we could have done with a drag lift running up the same lift line so we could ski on storm days - a 6 man will be on wind stop more often than the 4 man ever was
|
|
|
|
|
Well, the person's real but it's just a made up name, see?
Well, the person's real but it's just a made up name, see?
|
Idris, They have moved the line round the hill so that it starts further over than current Crystal but finished in current place. MAybe they have thought about wind.
|
|
|
|
|
You need to Login to know who's really who.
You need to Login to know who's really who.
|
|
|
Anyway, snowHeads is much more fun if you do.
Anyway, snowHeads is much more fun if you do.
|
|
|
You'll need to Register first of course.
You'll need to Register first of course.
|
I think they need to put plastic bubbles on Big Red and Emerald. Brrrr!!!
|
|
|
|
|
|
|
|
|
Hmm - the Crystal Zone/Fraggle Rock area is cool precisely because it doesn't get heaps of traffic - can see that changing. Harmony 6 pack pretty much means you need to be there when it pops to get the best lines. Fast chairs definitely change character.
|
|
|
|
|
|
|
|
|